BATHROOM REMODEL

Mt. Lebanon, PA

Project Location:

One Month

Project Timeline:

Large master bath with updated finishes

Project Vision:

The owners existing master bathroom was very small and the shower felt like a bunker, which leaked.

The owners wanted to take room from a sitting area of the master bedroom to extend the master bath to make a larger shower, double vanity and room to move.

The project started with demoing the existing bathroom and rough framing in the new layout.  Followed by installing the utilities and then insulation, drywall, tiling and finishes.

Project Description:

 

The following services were provided by IDR

  • Project Planning
  • Design
  • Demolition
  • Rough Framing
  • Finish Carpentry
  • Plumbing
  • HVAC
  • Electrical
  • Insulation
  • Drywall
  • Tile
  • Painting, Staining

Services Provided:

 

BEFORE

Photo Sep 01, 9 15 28 AM.jpg
Photo Sep 01, 9 15 34 AM.jpg
Photo Sep 01, 9 15 32 AM.jpg

In Progress

(I wish we could find them, stay tuned...)

Completed

home-design (1).jpg
home-design.jpg
home-design (2).jpg